Unfortunately, the foot or so of rain we have had in the last month has severely cramped our building "style".
Ground plumbing went in smoothly and then, before we could get it inspected, the rain came (again). If it is muddy inside the footings, if the inspector can't access the areas he needs, or if sand packed around certain areas has been washed out we will fail the inspection.
So we wait. We are hoping to see some major changes this week and to start framing early next week. Big changes! And very exciting. We just have to hang on to our spirit of patience. And figure out where to possibly make up the lost time later. :)
Aaron, our UBI consultant, helping review the ground plumbing. Notice our lovely "ponds" inside the footings.